beautypg.com

Other tasks and considerations, Verifying resources, Other tasks and considerations 455 – IBM NETCOOL 4.3-W User Manual

Page 477

background image

Appendix A: Configuration

Netcool/Proviso Cisco IP Telephony Technology Pack User’s Guide, Version 4.3-W

455

17-g. (Optional) You can also deploy reports on a regular basis by creating a cron entry that makes use of the

inventory

CLI command and the

-reportGrouping

option. This option instructs the inventory

command to run the report grouping rules and update the deployed reports stored in the database.

Report grouping rules must first have been created before this option can be used. For information on

creating report grouping rules, see the

Netcool/Proviso DataMart Configuration Guide

.

The following example shows a cron entry that periodically performs the deploy report operation:

0 * * * * . /opt/datamart/dataMart.env && inventory -noX -reportGrouping

See the Netcool/Proviso Command Line Interface Guide

for more information about the

inventory

command.

Other Tasks and Considerations

This section contains information on the following topics:

Verifying Resources

Verifying Resources

Use the Netcool/Proviso DataMart Resource Editor to determine if the technology pack’s resources (elements,
sub-elements, properties, and so forth) were successfully discovered and created in the database during inventory.

See the Netcool/Proviso DataMart Configuration Guide for information on using the Netcool/Proviso DataMart
Resource Editor.