beautypg.com

7 installation, 1 preparation, 2 installation procedure – Motorola PTP 400 Series User Manual

Page 51: 3 tools required, Installation, Preparation, Installation procedure, Tools required

background image

49

7 Installation

Motorola recommends that only qualified personnel undertake the installation of a PTP 400

Series Bridge solution.

7.1 Preparation

Before proceeding with the installation you should:

• Check the contents of all packages against the parts lists shown in the packing list.
• Ensure that you have the correct tools for the job.
• Ensure that you are qualified to undertake the work.
• Ensure that you have taken the correct safety precautions.
• Have completed the site planning as described in section 6 “Site Planning”.

7.2 Installation

Procedure

The installation procedure for a PTP 400 Series system consists of the following steps:

• Mounting the ODUs, section 7.6
• Connecting up, section 7.7
• Mounting the PIDU Plus units, section 7.7.6
• Powering

Up,

section

7.7.9

• Aligning the ODUs, section 7.7.10

7.3 Tools

Required

The following specific tools are required to install the PTP 400 Series Bridge in addition to

general tools:

• 13mm Spanner / Wrenche
• RJ45 Crimp Tool
• IBM Compatible Personal Computer (PC) running Windows 98 or later with 10 or

100baseT Ethernet (Ability to change IP settings easily is recommended)

• Either Internet Explorer version 6 or higher, or Mozilla Firefox v1.5 or higher are

recommended.

• Ethernet patch cable
• 6mm general purpose crimp tool for the grounding lug (

optional for lightening Protection

)