beautypg.com

3 testing your installation, 1 pre-power testing, Testing your installation – Motorola PTP 400 Series User Manual

Page 153: Pre-power testing, Pidu plus odu

background image

151

11.3 Testing Your Installation

If you have followed the above instructions you will have wired your system to the following

diagram:

Ethernet

1 Orange/White

3 Green/White

6 Green

8 Brown

4 Blue

5 Blue/White

7 Brown/White

2 Orange

Ethernet

Ethernet

LED/Reset

signalling

0V Floating

36V-55V

Chassis

1 Orange/White

3 Green/White

6 Green

8 Brown

4 Blue

5 Blue/White

7 Brown/White

2 Orange

Ethernet

LED/Reset

signalling

0V Floating

36V-55V

PIDU Plus

ODU

Surge Arrestor

ALPU-ORT

Cable Screen

Tower

T-568B

T-568B

CON3

CON4

CON1

CON2

1

2

3

6

4

5

7

8

3

5

2

4

8

1

6

7

Figure 82 - Simplified Circuit Diagram (Only One Transtector Shown For Clarity)

11.3.1 Pre-Power Testing

Before plugging in the RJ45 to the PIDU Plus, check the following impedances at the RJ45:

1. Check the cable resistance between pins 7 and 4 at the RJ45. Check against column 2 in

the Table 18.

2. Check the resistance between pins 8 and 5 at the RJ45. Check against column 3 in the

Table 18.

3. Check the resistance between pins 7 and 8 at the RJ45. The value should be greater

than 1000 ohms.