beautypg.com

Goodman Mfg MVC95 User Manual

Page 31

background image

31

G

AS

S

UPPLY

AND

P

IPING

Contact your distributor for a tabular listing of appropriate
manufacturer’s kits for propane gas and/or high altitude installa-
tions. The indicated kits must be used to insure safe and proper
furnace operation. All conversions must be performed by a quali-
fied installer, or service agency.

G

AS

V

ALVE

This unit is equipped with a 24 volt gas valve controlled during
furnace operation by the integrated control module. As shipped,
the valve is configured for natural gas. The valve is field convertible
for use with propane gas by replacing the regulator spring with a
propane gas spring from an appropriate manufacturer’s propane
gas conversion kit. Taps for measuring the gas supply pressure
and manifold pressure are provided on the valve.

The gas valve has a manual ON/OFF control located on the valve
itself. This control may be set only to the “ON” or “OFF” position.
Refer to the lighting instructions label or Startup Procedure &
Adjustment
for use of this control during start up and shut down
periods.

G

AS

P

IPING

C

ONNECTIONS

T

O

 

AVOID

 

POSSIBLE

 

UNSATISFACTORY

 

OPERATION

 

OF

 

EQUIPMENT

 

DAMAGE

 

DUE

 

TO

 

UNDERFIRING

 

OR

 

EQUIPMENT

USE

 

THE

 

PROPER

 

SIZE

 

OF

 

NATURAL

/

PROPANE

 

GAS

 

PIPING

 

NEEDED

 

WHEN

 

RUNNING

 

PIPE

 

FROM

 

THE

 

METER

/

TANK

 

TO

 

THE

 

FURNACE

.

WARNING

When sizing a trunk line, be sure to include all appliances which
will operate simultaneously when sizing a trunk line.

The gas piping supplying the furnace must be properly sized based
on the gas flow required, specific gravity of the gas, and length of
the run. The gas line installation must comply with local codes, or
in their absence, with the latest edition of the National Fuel Gas
Code, NFPA 54/ANSI Z223.1.

Natural Gas Capacity of Pipe

In Cubic Feet of Gas Per Hour (CFH)

Length of

Nominal Black Pipe Size

Pipe in Feet

1/2"

3/4"

1"

1 1/4"

1 1/2"

10

132

278

520

1050

1600

20

92

190

350

730

1100

30

73

152

285

590

980

40

63

130

245

500

760

50

56

115

215

440

670

60

50

105

195

400

610

70

46

96

180

370

560

80

43

90

170

350

530

90

40

84

160

320

490

100

38

79

150

305

460

(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific Gravity Gas)

CFH = BTUH Furnace Input

Heating Value of Gas (BTU/Cubic Foot)

To connect the furnace to the building’s gas piping, the installer
must supply a ground joint union, drip leg, manual shutoff valve,
and line and fittings to connect to gas valve. In some cases, the

installer may also need to supply a transition piece from 1/2" pipe
to a larger pipe size.

The following stipulations apply when connecting gas piping. Re-
fer to Gas Piping Connections figure for typical gas line connec-
tions to the furnace.

Use black iron or steel pipe and fittings for building piping.
Where possible, use new pipe that is properly chamfered,
reamed, and free of burrs and chips. If old pipe is used, be
sure it is clean and free of rust, scale, burrs, chips, and old
pipe joint compound.

Use pipe joint compound on male threads ONLY. Always
use pipe joint compound (pipe dope) that is APPROVED
FOR ALL GASSES. DO NOT apply compound to the first
two threads.

Use ground joint unions.

Install a drip leg to trap dirt and moisture before it can enter
the gas valve. The drip leg must be a minimum of three
inches long.

Install a 1/8" NPT pipe plug fitting, accessible for test gage
connection, immediately upstream of the gas supply
connection to the furnace.

Always use a back-up wrench when making the connection
to the gas valve to keep it from turning. The orientation of
the gas valve on the manifold must be maintained as shipped
from the factory. Maximum torque for the gas valve
connection is 375 in-lbs; excessive over-tightening may
damage the gas valve.

Install a manual shutoff valve between the gas meter and
unit within six feet of the unit. If a union is installed, the
union must be downstream of the manual shutoff valve,
between the shutoff valve and the furnace.

Tighten all joints securely.

Connect the furnace to the building piping by one of the
following methods:

Rigid metallic pipe and fittings.

Semi-rigid metallic tubing and metallic fittings.
Aluminum alloy tubing must not be used in exterior
locations. In order to seal the grommet cabinet
penetration, rigid pipe must be used to reach the outside
of the cabinet. A semi-rigid connector to the gas piping
may be used from there.

Use listed gas appliance connectors in accordance with
their instructions. Connectors must be fully in the same
room as the furnace.

Protect connectors and semirigid tubing against physical
and thermal damage when installed. Ensure aluminum-
alloy tubing and connectors are coated to protect against
external corrosion when in contact with masonry, plaster,
or insulation, or subjected to repeated wetting by liquids
such as water (except rain water), detergents, or sewage.

This manual is related to the following products: