beautypg.com

Goodman Mfg MVC95 User Manual

Page 24

background image

24

C

ONDENSATE

D

RAIN

L

INES

& D

RAIN

T

RAP

U

PRIGHT

I

NSTALLATIONS

-T

RAP

ON

L

EFT

S

IDE

NOTE: For left side trap installation, grommets must be moved
to the left side of the furnace and the plugs installed on the right
side of the furnace.

1. Remove the rubber plug/cap from the left side drain port

on the front cover.

2. Secure Hose A to front cover drain port with a red hose

clamp. Route hose to rear side panel grommet hole.

3. Cut and remove 1/4 inch from the end of the drain port on

the rubber elbow.

4. Insert Tube 1 into rubber elbow drain port and secure with

silver hose clamp. Angle tube outward toward front of

furnace.

5. Cut “X” inches from the long end of Hose B and discard.

Refer to table for appropriate length to cut. Secure
remaining hose to Tube 1 with a green hose clamp. Route
other end of Hose B to front left side panel grommet hole.

NOTE: Long hose “B” must always be connected to Tube 1 and
the elbow and not on the front cover.

6. Insert short end of each Tube 2 through side panel grommet

holes. Secure tubes to Hose A and Hose B with green
hose clamps. Ensure hoses and tubes maintain a
downward slope for proper drainage and that they are not
kinked or binding.

LEFT

SIDE PANEL

FRONT COVER

DRAIN PORT

HOSE A

SIDE PANEL

DRAIN

HOLES

TUBE(S) 2

DRAIN

TRAP

GREEN HOSE

CLAMP

TUBE 1

RUBBER

ELBOW

HOSE B

RUBBER

ELBOW

DRAIN PORT

RED HOSE

CLAMP

SILVER HOSE

CLAMP

GREEN

HOSE CLAMP

Upright “Standard” Connections - Left Side

(Upflow Shown, Counterflow Similar)

Cabinet Width

(inches)

Models

(kBTU_Tons)

"X" Length to Cut From Long

End of Hose B

(inches)

17 1/2

45_30

7

21

70_40

3 1/2

090_50
115_50

None

24 1/2

This manual is related to the following products: