beautypg.com

Goodman Mfg MVC95 User Manual

Page 22

background image

22

C

ONDENSATE

D

RAIN

L

INES

& D

RAIN

T

RAP

U

PRIGHT

I

NSTALLATIONS

-T

RAP

ON

R

IGHT

S

IDE

In a upright installation drain hoses are connected to drain ports on
the rubber elbow and the recuperator coil front cover. The drain lines
are then routed through the right side panel and into the drain trap
secured to the outside of the cabinet.

NOTE: Refer to Alternate Vent/Flue Hose Connections for upright
installations using an alternate vent/flue outlet.

1. Remove the rubber plug from the right side of the front cover

drain port.

2. Secure Hose A to front cover drain port with a red hose clamp.

Route hose to rear side panel grommet hole.

3. Cut and remove 1/4 inch from the end of the drain port on the

rubber elbow.

4. Insert Tube 1 into rubber elbow drain port and secure with

silver hose clamp. Angle tube outward toward front of furnace.

5. Cut 17 3/4 inches from the long end of Hose B and discard.

Secure the remaining hose to Tube 1 with a green hose

clamp. Route the other end of Hose B to front right side

panel grommet hole.

For details concerning mounting of the drain trap, refer to Horizontal

Drain Trap Mounting.

6. Insert short end of each of tube 2 through side panel grommet

holes. Secure tubes to hoses A and B with green hose
clamps. Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.

DRAIN

TRAP

FRONT

COVER

DRAIN PORT

TUBE(S) 2

GREEN

HOSE

CLAMPS

(3 PLACES)

RIGHT SIDE

PANEL

RUBBER ELBOW

DRAIN PORT

TUBE 1

SIDE PANEL

GROMMET

HOLES

HOSE

B

HOSE

A

RUBBER

ELBOW

RED HOSE

CLAMP

SILVER HOSE CLAMP

Upright “Standard” Connections - Right Side

(Upflow Shown, Counterflow Similar)

This manual is related to the following products: