7. Disconnect Wire N1A from transfer relay (TR) terminal

and connect one test lead to it. Connect the other test
lead to F1 top fuse terminal Wire N1A. CONTINUITY
should be read. Reconnect Wire N1A.

RESULTS:
Repair any defective wiring that does not read
CONTINUITY. If wiring tests good, proceed to Test
23.

TEST 33 - CONTINUITY TEST OF WIRING (C2)

DISCUSSION:
This test will ensure that all control wiring has
continuity.

1. See Test 32, Step 1

2. See Test 32, Step 2

3. See Test 32, Step 3

4. See Test 32, Step 4

5. Disconnect Wire E2 from the standby coil (C2) and

connect one test lead to it. Connect the other test lead
to Terminal Lug E2 of the transfer switch. CONTINUITY
should be read. Reconnect Wire E2.

6. Disconnect Wire 205 from transfer relay (TR) Terminal 6

and connect one test lead to it. Connect the other test
lead to limit switch XB1 top terminal Wire 205.
CONTINUITY should be read. Reconnect Wire 205.

7. Disconnect Wire E1 from Transfer Relay (TR) Terminal 9

and connect one test lead to it. Connect the other test
lead to terminal lug E1 of the transfer switch.
CONTINUITY should be read. Reconnect Wire E1.

RESULTS:
Repair any defective wiring that does not read
CONTINUITY. If wiring tests good, proceed to Test
23.

TEST 34 - CHECK N1 AND N2 WIRING

DISCUSSION:
A shorted Wire N1 or N2 to ground can cause fuse F1
or F2 to blow.

PROCEDURE:

1. On the generator panel, set the Auto-Off-Manual switch

to OFF.

2. Turn off the utility power supply to the transfer switch,

using whatever means are provided.

3. Remove fuses F1 and F2 from the fuse holder (see

Figure 5).

4. Remove the generator control panel cover. Disconnect

wire N1 and wire N2 from the interconnection terminal in
the control panel, or the terminal strip.

5. Set your VOM to the 'R x 1" scale. Connect the positive

meter test lead to wire N1.

a. Connect the negative meter lead to the ground

lug. Infinity should be measured.

b. Connect the negative meter lead to Wire 23 at

ICT or terminal strip. Infinity should be
measured.

c. Connect the negative meter lead to Wire 194 at

ICT or terminal strip. Infinity should be
measured.

d. Connect the negative meter lead to the neutral

connection. Infinity should be measured.

6. Set your VOM to the 'R x 1" scale. Connect the positive

meter test lead to wire N2.

a. Connect the negative meter lead to the ground

lug. Infinity should be measured.

b. Connect the negative meter lead to Wire 23 at

ICT or terminal strip. Infinity should be
measured.

c. Connect the negative meter lead to Wire No.

194 at ICT or terminal strip. Infinity should be
measured.

d. Connect the negative meter lead to the neutral

connection. Infinity should be measured.

7. Disconnect wire N1 and wire N2 from transformer TX.

8. Connect one test lead to wire N1 removed in step 7, and

the other test lead to the ground terminal. INFINITY
should be measured.

9. Connect one test lead to wire N2 removed in step 7, and

the other test lead to the ground terminal. INFINITY
should be measured.

10.If no short is indicated in steps 5 through 9, proceed with

steps 11 through 15. If a short is indicated in steps 5
through 9, repair shorted wiring.

11.Reconnect wires N1 and N2 to the interconnection

terminal or terminal strip.

12.Replace fuses F1 and F2 in the fuse holder.

13.Turn on the utility power supply to the transfer switch

using whatever means is provided.

14.Set VOM to measure AC voltage. Connect one test lead

to wire N1 and the other test lead to wire N2. Utility line
to line voltage should be measured.

15.Turn off the utility power supply to the transfer switch

using whatever means is provided.