C 9.92, Operating instructions, Maintenance during the initial period of operation – Holder C 9.92 H User Manual
Page 169: Maintenance after the first 50 service hours

Operating Instructions
153 146
167
C 9.92
Maintenance during the initial period
of operation
The following services and inspections are due during the
initial period of operation:
Maintenance after the first 50 service hours
Maintenance after the first 500 service hours
Maintenance after the first 50 service
hours
Checking the engine for leaks
-
Raise the dumping subframe (dump body*) and
secure it against accidental lowering.
-
Check the engine and attachments for leaks.
Checking air tubes and air hoses for leaks
-
Check the air tubes and air hoses (1) for damage and
leaks.
Bild_S 990_033
1
* Option