Enterasys Networks Enterasys Gold Distributed Forwarding Engine 4G4285-49 User Manual
Page 91
Gaining Access to Memory Modules
Enterasys Matrix DFE-Gold Series PoE Module Hardware Installation Guide B-13
Figure B-9 Installing the Network Expansion Module
3.
Use two of the saved coverplate screws to fasten the NEM to the DFE module front
panel, but do not tighten screws at this time.
4.
Insert the saved standoff through the NEM to the standoff on the main board. Screw
in the standoff, but do not tighten screws at this time.
5.
Tighten the two coverplate screws first, then the standoff.
1 NEM
3 NEM connectors
5 Coverplate screws (2)
2 Front panel
4 Main board connectors
6 Standoff
This manual is related to the following products: