Figure 3‐2, Sis. refer to, Figure 3-2 – Enterasys Networks Enterasys Gold Distributed Forwarding Engine 4G4285-49 User Manual
Page 44: Жг в а, 6 upper/lower locking tab (in closed position), Power fan
Preparing to Install Module into Matrix E7 or N7 Chassis
3-10 Installation
Figure 3-2 Installing Module into Matrix E7 or Matrix N7 Chassis (E7 shown)
1 Card guides
7 Backplane connectors
2 Slot number 6 (Left-most slot is 1)
• Top two connectors (power and FTM2
3 Module card
• Bottom two connectors (power and FTM1)
4 Metal back panel
(no bottom connectors in Matrix N7
5 Upper/lower locking tabs (in proper open
position)
chassis
)
6 Upper/lower locking tab (in closed
position)
1
Е
Е
SERIES
E7
4
5
6
7
2
3
Á
50/60Hz
LINE
100-125V~12A
200-240V~6A
50/60Hz
LINE
100-125V~12A
200-240V~6A
ACON
1
0
POWER
FAN
PS1
50/60Hz
LINE
100-125V~12A
200-240V~6A
50/60Hz
LINE
100-125V~12A
200-240V~6A
ACON
1
0
POWER
FAN
PS2
Ж
Г
В
А
COM
OFFLINE / RESET
CPU
MGMT
GROUP
GROUP
SELECT
GROUP 1
GROUP 2
GROUP 3
1X
6X
7X
12X
13X
18X
19X
24X
1 2 3
4G4205-72
Gb ENET
DFE
Д
Д