Completing the installation, Completing the installation -16 – Enterasys Networks Enterasys Diamond Distributed Forwarding Engine 7KR4297-04 User Manual
Page 38
Completing the Installation
3-16 Installation
Completing the Installation
Completing the DFE‐Diamond module installation depends on if the module is being installed in:
•
a new DFE‐Diamond module system (refer to “
Completing the Installation of a New System
•
an established, operating DFE‐Diamond module system (refer to “
DFE‐Diamond Module in an Existing System
VT Series Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
4
Red 2
Transmit
(TX)
1
Blue
3
Receive (RX)
6
Yellow
5
Clear to Send (CTS)
5
Green 7
Ground
(GRD)
2
Orange
20
Data Terminal Ready
Modem Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
1
Blue
2
Transmit (TX)
2
Orange
8
Data Carrier Detect (DCD)
4
Red
3
Receive
5
Green 7
Ground
(GRD)
6
Yellow
20
Data Terminal Ready (DTR)
8
Gray
22
Ring Indicator
RJ45 Connector (Female)
Pins
8
1
DB25 Connector (Female)
Pins
25
14
13
1
RJ45 Connector (Female)
Pins
8
1
DB25 Connector (Male)
Pins
14
25
1
13