beautypg.com

World class 3000, Instruction manual – Emerson Process Management 3000 User Manual

Page 142

background image

Instruction Manual

Appendix D Rev. 2.4
July 1998

D-6 Appendices

Rosemount Analytical Inc. A Division of Emerson Process Management

World Class 3000

YES

YES

NO

NO

SYMPTOM

SOLENOID IS

OPERATING NORMALLY.

ENSURE THAT A

SUFFICIENT SUPPLY OF

CALIBRATION GAS IS

AVAILABLE.

CALL FOR FACTORY

ASSISTANCE.

SET METER* FOR 50 VDC.

PLACE PROBES ON

TERMINAL BLOCK J2, CAL

RET, AND J1 HI GAS.

INSTALL NEW CALIBRATION

GAS BOTTLES.

SOLENOID IS RECEIVING

24 VDC.

YES

REPLACE SOLENOID.

NO

PLACE PROBES FROM

METER ON J11.

METER INDICATES

24 VDC.

YES

REPLACE TERMINAL

BOARD.

NO

FUSES BLOWN IN MPS.

NO

PLACE PROBES FROM

METER ON J1, LINE 1,

AND LINE 2. SET METER

FOR 200 VAC.

YES

REPLACE BLOWN FUSES.

METER INDICATES 110

VAC AT J1.

YES

REPLACE POWER SUPPLY.

NO

CHECK MAIN POWER

SOURCE.

*SIMPSON MODEL 260 OR

EQUIVALENT MULTIMETER.

27270023

Figure D-5. MPS Troubleshooting Flowchart