Ac connections (mpsl-30d and mpsh-30d models) – Magnum Energy Magnum Panel (MP Series) User Manual
Page 48

© 2011 Magnum Energy, Inc.
Page 41
3.0 Installation
IMPORTANT: AC - GROUND CONNECTION
(remove this green wire if the neutral is bonded
to ground either at the generator or grid source)
INV HOT 1 OUT
(from inverter’s
AC HOT 1 output)
INV HOT 2 OUT
(from inverter’s
AC HOT 2 output)
INV NEUTRAL OUT
(from inverter’s
AC NEUTRAL output)
AC NEUTRAL IN
(from neutral of
generator or grid)
AC LEG 1 IN
(from L1 side of
generator or grid)
AC LEG 2 IN
(from L2 side of
generator or grid)
GROUND BUSBAR
(inverter’s input and
output AC GROUND)
GROUND BUSBAR
(from generator/grid
ground and to AC
load panel ground)
O
U
TPU
T
FR
O
M
IN
VER
TER
IN
PU
T
TO
IN
VER
TER
INVERTER
GROUND
O
U
TPU
T
T
O
IN
VER
TE
R
LO
A
D
S
LOADS &
GEN/GRID
GROUND
IN
P
U
T
FR
O
M
G
E
N
/G
R
ID
INV NEUTRAL IN*
(to inverter’s
AC NEUTRAL input)
INV HOT 1 IN
(to inverter’s
AC HOT 1 input)
INV HOT 2 IN
(to inverter’s
AC HOT 2 input)
AC LEG 1 OUT
(to main breaker on L1
side in AC load panel)
AC LEG 2 OUT
(to main breaker on L2
side in AC load panel)
AC NEUTRAL OUT
(to NEUTRAL busbar
in AC load panel)
AC Connections (MPSL-30D and MPSH-30D Models)
* The INV NEUTRAL IN is not required if
MS-PAE inverters are used (the neutrals
are common in these inverters).
Figure 3-17, MPSL-30D and MPSH-30D AC Wiring Connections