beautypg.com

Installation, Ms series inverter/charger (front view), Battery bank – Magnum Energy MS Series User Manual

Page 24

background image

©

2012 Magnum Energy, Inc.

Page 15

Installation

Figure 2-4, DC and Battery Temperature Sensor Wiring

DC System Grounding point

[Electrode Conductor

(i.e., ground busbar)]

MS Series

Inverter/Charger

(front view)

Battery Temp Sensor Cable*

Inverter’s DC Negative Busbar

Inverter’s DC Positive Busbar

Inverter’s Equipment Ground Wire

BTS

BTS

MMP enclosure – for single inverter installations

(includes DC disconnect breaker, DC shunt for

battery monitor, and inverter DC busbars). If

multiple inverters will be installed, see the MP

enclosures - designed to allow up to four

inverters to be connected together.

Battery Bank

Battery Bank’s Equipment Ground Wire
Battery Bank’s Negative Cable

Battery Bank’s Positive Cable

This manual is related to the following products: