SMA SC 100LV-560HE User Manual
SMA Equipment
Table of contents
Document Outline
- 1 Notes on this Manual
- 2 Safety
- 3 Delivery
- 4 Mounting the Device
- 5 Electrical Connection
- 5.1 Internal Connections
- 5.1.1 Power cabling between sine filter and transformer
- 5.1.2 HE version: Power cable connection
- 5.1.3 PE connection between AC cabinet and DC / inverter cabinet
- 5.1.4 Control lines at the transfer terminal strip
- 5.1.5 Connecting Sunny Central Control to power unit
- 5.1.6 Internal control lines of the power unit
- 5.1.7 Communication for insulation monitoring
- 5.1.8 Installing internal temperature sensor
- 5.1.9 Team cabling (optional)
- 5.1.10 EVR Cabling (optional)
- 5.1.11 Sunny Central for installation near the sea (optional)
- 5.2 External Connections
- 5.2.1 AC grid-connection standard devices
- 5.2.2 AC grid connection of HE versions
- 5.2.3 AC grid connection with MV stations
- 5.2.4 Connection PE rail with HE version
- 5.2.5 AC control voltage
- 5.2.6 Handling the Connection Terminals Control voltage
- 5.2.7 DC connection
- 5.2.8 Team Power Cabling
- 5.2.9 External messages and signals
- 5.2.10 Sensors and digital outputs
- 5.2.11 Shield Contact Handling Instructions
- 5.2.12 Serial Interfaces
- 5.2.13 Emergency-stop cabling
- 5.2.14 Surge protection
- 5.1 Internal Connections
- 6 Commissioning
- 7 Appendix A: Transport instructions
- 8 Contact
- 9 Appendix A - Mechanical data
- 10 Appendix B - Minimum Clearance
- 11 Appendix C - Air volume
- 12 Appendix D - Cable cross section and Torque