5 ac control voltage – SMA SC 100LV-560HE User Manual

Page 56

background image

Electrical Connection

SMA Solar Technology AG

56

SC125_560HE-IEN083220

Installation Guide

5.2.5 AC control voltage

The energy required for driving the Sunny Central is provided by an external control voltage supply
source. As standard, The form of grid connection of the control voltage supply source is TN-S grid.
The connection in the Sunny Central inverters of the type 100LV, 125LV, 150, 200 and 200HE is
single-phase. For all other Sunny Centrals it is three phase. The connection is made via a separate
cable.

As an option, the power required for driving the internal circuits of the Sunny Central 230 / 400 V
(except HE version) can be taken internally from the grid-feed-in line of the inverter. This reduces the
feed-in energy yields by the amount of power required by the inverter itself (fans, heating etc.). To
realize this, the connection terminals of the AC control voltage have to be bridged according to the
circuit diagram.
Connection terminal for control voltage in the Sunny Central 150

WARNING!
Risk of death due to burns and electric shock when live parts are touched!

• Only work on this device when it is switched off and under voltage-free conditions.

Realization of the external control voltage
When connecting the external control voltage, it is obligatory to follow the circuit diagram
included in the delivery.