Installation Guide

4 Mounting the Device

4.1 Installation Site Requirements

4.1.1 Foundation

The foundation must guarantee solid and safe positioning of the inverter. The foundation must provide
the load-carrying capacity necessary to cope with the weight of the inverter. The inverter cabinet must
be installed on a level surface. Any existing unevenness, depressions or slopes must be corrected prior
to installation.

4.1.2 Distance to the wall

When installing the inverter, appropriate distance to the wall for minimum passageways, escape
routes and ventilation have to be observed. Corresponding information about the inverter type in
question are included in the "Sunny Central Installation requirements" (separate document).

4.1.3 Inverter Protection Rating / EMC / Sound Levels

The Sunny Central is suitable for installation in a station located in a dry, dust-reduced environment
according to protection rating IP20. With regard to the EMC emissions and the noise level, the Sunny
Central inverter is designed for installation in an industrial environment.

Sunny Central Installation requirements
Every Sunny Central has different individual installation requirements. These can be
ordered at any time from SMA Solar Technology and have to be observed for project
planning and for the preparation of the installation site.

Sunny Central installation location
The Sunny Central inverter has to be installed in an electrical operating room.