beautypg.com

7 communication for insulation monitoring – SMA SC 100LV-560HE User Manual

Page 41

background image

SMA Solar Technology AG

Electrical Connection

Installation Guide

SC125_560HE-IEN083220

41

5.1.7 Communication for insulation monitoring

The insulation monitoring is located in the DC cabinet. A 2-wire data line connects the Sunny Central
Control with the insulation monitoring and has to be connected as follows:

• Connection: M (+) clamp insulation monitoring: brown wire
• Connection: M (-) clamp insulation monitoring: white wire

Insulation monitoring with connected data line (A) with Sunny Central 500HE and
Sunny Central 560HE

Attention!
Damage to the cabling through faulty installation.

• Lay the connection cables in the cable channel.

Position of the connection terminal of the insulation monitoring
With the help of the equipment identifier and the provided circuit diagram, the exact
position of the insulation monitoring can be determined.