7  Commissioning

SMA Solar Technology AG

46

Ersatzstrom-IS-en-30

Installation - Quick Reference Guide

13. Check whether the phase coupling switches correctly. To do this, close circuit breakers F3 and F4 and check the

following:

14. Switch on circuit breaker F1.

• Contactors Q4 and Q6 deactivate within five minutes and the tie switch then connects the battery backup grid

to the utility grid.

7.3 Adjusting the Configuration of the Sunny Island Inverter

7.3.1 Countries in Which the Configuration Must Be Adjusted

In the SMA Flexible Storage System, the Sunny Island inverters are connected to the utility grid and must meet the

requirements of the grid operators. Depending on the settings, the Sunny Island inverters satisfy the requirements of the

application rule VDE-AR-N 4105:2011-08 or the standard AS4777. The application rule is stored in the Sunny Island

as the standard country data set VDE-AR-4105 or AS4777.
The configuration must be adjusted for the following countries (status: July 2014):

• Denmark (see Section 7.3.2, page 47)
• France (see Section 7.3.3, page 47)
• Austria (see Section 7.3.4, page 47)
• Switzerland (see Section 7.3.5, page 48)

The configuration may only be adjusted on request or with permission of the grid operator in the following countries

(status: July 2014):

• Australia

Country data set: AS4777

• Belgium

Country data set: VDE-AR-4105

• Germany

Country data set: VDE-AR-4105

Use in other countries is possible with the agreement of the grid operator. Consult the grid operator on whether

adjustment is necessary.

Check point

Task

Connection X2

Measure if there is voltage present between the line conductors and the neutral

conductor.
If no voltage is present, correctly wire contactor Q6.
Ensure that no voltage is present between the line conductors.