7 Commissioning
SMA Solar Technology AG
46
Ersatzstrom-IS-en-30
Installation - Quick Reference Guide
13. Check whether the phase coupling switches correctly. To do this, close circuit breakers F3 and F4 and check the
following:
14. Switch on circuit breaker F1.
• Contactors Q4 and Q6 deactivate within five minutes and the tie switch then connects the battery backup grid
to the utility grid.
7.3 Adjusting the Configuration of the Sunny Island Inverter
7.3.1 Countries in Which the Configuration Must Be Adjusted
In the SMA Flexible Storage System, the Sunny Island inverters are connected to the utility grid and must meet the
requirements of the grid operators. Depending on the settings, the Sunny Island inverters satisfy the requirements of the
application rule VDE-AR-N 4105:2011-08 or the standard AS4777. The application rule is stored in the Sunny Island
as the standard country data set VDE-AR-4105 or AS4777.
The configuration must be adjusted for the following countries (status: July 2014):
• Denmark (see Section 7.3.2, page 47)
• France (see Section 7.3.3, page 47)
• Austria (see Section 7.3.4, page 47)
• Switzerland (see Section 7.3.5, page 48)
The configuration may only be adjusted on request or with permission of the grid operator in the following countries
(status: July 2014):
• Australia
Country data set: AS4777
• Belgium
Country data set: VDE-AR-4105
• Germany
Country data set: VDE-AR-4105
Use in other countries is possible with the agreement of the grid operator. Consult the grid operator on whether
adjustment is necessary.
Check point
Task
Connection X2
Measure if there is voltage present between the line conductors and the neutral
conductor.
If no voltage is present, correctly wire contactor Q6.
Ensure that no voltage is present between the line conductors.