background image

5  Battery Backup Systems Without All-Pole Disconnection

SMA Solar Technology AG

36

Ersatzstrom-IS-en-30

Installation - Quick Reference Guide

5.2.3 Connecting the Master

Figure 15: Connecting the master

Position

Designation

Description/information

A

AC power cable

Sunny Island: connection AC2 Gen/Grid terminals L, N

TT

,

and

PE

Automatic transfer switch: connection X3 terminals L1, N, and

PE
Conductor cross-section: 10 mm² to 16 mm²

B

Measuring cable for voltage

measurement

Sunny Island: connection ExtVtg terminals L and N

Automatic transfer switch: connection X4 terminals L1 and N
Conductor cross-section: 1.5 mm² to 2.5 mm²

C

DC+ cable

Battery connection
Conductor cross-section: 50 mm² to 95 mm²
Cable diameter: 14 mm to 25 mm

D

DC − cable

E

Measuring cable of the battery

temperature sensor

Sunny Island: BatTmp connection
You only have to connect a battery temperature sensor if

lead-acid batteries are used. Mount the battery temperature

sensor in the middle of the battery connection, in the upper third

of the battery cell.