beautypg.com

4 connecting the slaves – SMA SI 3.0-11 Quick Reference Guide V.3.0 User Manual

Page 38

background image

5  Battery Backup Systems Without All-Pole Disconnection

SMA Solar Technology AG

38

Ersatzstrom-IS-en-30

Installation - Quick Reference Guide

5.2.4 Connecting the Slaves

Figure 16: Connecting the slaves

Position

Designation

Description/information

A

AC power cable

Sunny Island: connection AC2 Gen/Grid terminals L, N

TT

,

and PE

Automatic transfer switch:

Connect slave 1 to X3 terminals L2, N, and PE.

Connect slave 2 to X3, terminals L3, N, and PE.

Conductor cross-section: 10 mm² to 16 mm²

B

Measuring cable for voltage

measurement

Sunny Island: connection ExtVtg terminals L and N

Automatic transfer switch:

Connect slave 1 to X4 terminals L2 and N.

Connect slave 2 to X4 terminals L3 and N.

Conductor cross-section: 1.5 mm² to 2.5 mm²

C

DC+ cable

Battery connection
Conductor cross-section: 50 mm² to 95 mm²
Cable diameter: 14 mm to 25 mm

D

DC − cable

E

Data cable for the internal

communication in the cluster

Sunny Island: ComSync In connection

F

Data cable for the internal

communication in the cluster

Sunny Island: ComSync Out connection
With slave 2, leave terminator plugged in.

Slave 2 is connected to slave 1 only.

This manual is related to the following products: