SMA Solar Technology AG

7  Commissioning

Installation - Quick Reference Guide

Ersatzstrom-IS-en-30

45

4. Close circuit breaker F1 and check the following:

5. Close circuit breaker F6.

☑ Voltages are present at connection X3.

6. Check whether the residual-current devices trip correctly and are correctly wired:

7. Start the Sunny Island. Press and hold the button on the Sunny Remote Control until you hear an acoustic signal.
8. Check whether error messages are displayed on the Sunny Remote Control.

If the error message F365 VAcExtPhsFail is displayed, correctly connect connection ExtVtg on the Sunny Island.

9. Close circuit breaker F5 and check whether contactors Q4 and Q6 remain in non-operative mode.

If the contactors activate, correctly wire connections Relay2 C and Relay2 NO on the Sunny Island.

10. Simulate a grid failure. To do this, open circuit breaker F1. As a result, contactors Q1, Q2, and Q3 deactivate.

If the error message F367 ExtCtcNotOpen is displayed, correctly connect connections DigIn and BatVtgOut to

the Sunny Island.

11. Check whether contactors Q4 and Q6 activate approximately five seconds after circuit breaker F1 is opened.

If the contactors do not activate, correctly wire the control cables of the contactors and correctly connect connections

Relay2 C and Relay2 NO to the master.

12. Check whether the grounding device switches correctly.

• Ensure that no voltage is present at connection X2 between terminals N and PE and that conductivity can be

measured.

• Open circuit breaker F5.
• Ensure that no voltage is present at connection X2 between terminals N and PE and that conductivity can be

measured.

• Close circuit breaker F5.

Check point

Task

Contactors Q1, Q2, and Q3

Check whether the contactors activate and whether there is voltage present and

a right-hand rotating magnetic field at connection X2.
If the contactors do not activate or no voltage is present at connection X2,

ensure the following:

• At the master, ensure that the control cable is correctly connected to

connections Relay1 C and Relay1 NC.

• Ensure that, in the automatic transfer switch, contactors Q1, Q2, and Q3

are correctly wired.

Connection X2

Check point

Task

Residual-current device F7

Press the test button and measure whether there is voltage present at connection

X3.
If voltage is present, correctly wire residual-current device F7.
Switch on residual-current device F7 again.

Residual-current device F2

Press the test button and check if contactors Q1, Q2, and Q3 go into

non-operative mode.
If the contactors do not deactivate, wire the residual-current device F2 correctly.
Switch on residual-current device F2 again.