beautypg.com

4 ac circuit breaker (optional) – SMA SC 500CP-10-JP Maintenance Manual User Manual

Page 16

background image

5  Maintenance under Voltage Conditions

SMA Solar Technology AG

16

SCCP-JP-WA-A4-en-12

Maintenance Manual

5.4 AC Circuit Breaker (Optional)

Figure 3: Switch positions of the AC circuit breaker

Additionally required maintenance material (not included in the scope of delivery):

☐ A testing device approved by the manufacturer of the AC circuit breaker, e.g. TT1 from ABB.

Procedure:

• Use the testing device to check whether the AC circuit breaker is ready for operation (instructions for testing are

included in the documentation of the testing device).
If the AC circuit breaker is not ready for operation, contact the SMA Service Line.

Position

Designation

A

Off position

B

Triggered position

C

On position