beautypg.com

3 drilling (cycle 200), Cycle run, Please note while programming – HEIDENHAIN 530 (340 49x-07) Cycle programming User Manual

Page 77

background image

HEIDENHAIN iTNC 530

77

3.3 DRILLING (Cy

c

le 20

0)

3.3 DRILLING (Cycle 200)

Cycle run

1

The TNC positions the tool in the spindle axis at rapid traverse FMAX
to the set-up clearance above the workpiece surface.

2

The tool drills to the first plunging depth at the programmed feed
rate F.

3

The TNC returns the tool at FMAX to the set-up clearance, dwells
there (if a dwell time was entered), and then moves at FMAX to the
set-up clearance above the first plunging depth.

4

The tool then advances with another infeed at the programmed
feed rate F.

5

The TNC repeats this process (2 to 4) until the programmed depth
is reached.

6

The tool is retracted from the hole bottom to the set-up clearance
or—if programmed—to the 2nd set-up clearance at FMAX.

Please note while programming:

Program a positioning block for the starting point (hole
center) in the working plane with radius compensation R0.

The algebraic sign for the cycle parameter DEPTH
determines the working direction. If you program DEPTH
= 0, the cycle will not be executed.

Danger of collision!

Enter in MP7441 bit 2 whether the TNC should output an
error message (bit 2=1) or not (bit 2=0) if a positive depth
is entered.

Keep in mind that the TNC reverses the calculation for pre-
positioning when a positive depth is entered. This
means that the tool moves at rapid traverse in the tool axis
to set-up clearance below the workpiece surface!

This manual is related to the following products: