3 drilling (cycle 200), Cycle run, Please note while programming – HEIDENHAIN 530 (340 49x-07) Cycle programming User Manual
Page 77

HEIDENHAIN iTNC 530
77
3.3 DRILLING (Cy
c
le 20
0)
3.3 DRILLING (Cycle 200)
Cycle run
1
The TNC positions the tool in the spindle axis at rapid traverse FMAX 
to the set-up clearance above the workpiece surface.
2
The tool drills to the first plunging depth at the programmed feed 
rate F.
3
The TNC returns the tool at FMAX to the set-up clearance, dwells 
there (if a dwell time was entered), and then moves at FMAX to the 
set-up clearance above the first plunging depth.
4
The tool then advances with another infeed at the programmed 
feed rate F.
5
The TNC repeats this process (2 to 4) until the programmed depth 
is reached.
6
The tool is retracted from the hole bottom to the set-up clearance 
or—if programmed—to the 2nd set-up clearance at FMAX.
Please note while programming:
Program a positioning block for the starting point (hole 
center) in the working plane with radius compensation R0.
The algebraic sign for the cycle parameter DEPTH 
determines the working direction. If you program DEPTH 
= 0, the cycle will not be executed.
Danger of collision!
Enter in MP7441 bit 2 whether the TNC should output an 
error message (bit 2=1) or not (bit 2=0) if a positive depth 
is entered.
Keep in mind that the TNC reverses the calculation for pre-
positioning when a positive depth is entered. This 
means that the tool moves at rapid traverse in the tool axis 
to set-up clearance below the workpiece surface!
