beautypg.com

Checklist before installation – H3C Technologies H3C SecPath F5000-A5 Firewall User Manual

Page 18

background image

8

Checklist before installation

Table 4 Checklist before installation

Item Requirements

Result

Installation site

Weight support

The floor can support the total weight of the rack,
chassis, cards, power modules, and all other
components.

Operating ambient
temperature

0°C to 45°C (32°F to 113°F)

Operating ambient
relative humidity

10% to 95% (noncondensing)

Cleanness

Dust concentration ≤ 3 × 10

4

particles/m

3

No dust on desk within three days

Ventilation

There is a minimum clearance of 10 cm (3.94 in)

around the inlet and exhaust vents for heat
dissipation of the firewall chassis.

A ventilation system is available at the installation

site.

ESD prevention

The equipment and floor are well grounded.

The equipment room is dust-proof.

The humidity and temperature are at a compliant

range.

Wear an ESD wrist strap and uniform when

touching a circuit board.

Place the removed MPU, service card, and CF

card on an antistatic workbench, with the face

upward, or put it into an antistatic bag.

Touch only the edges, instead of electronic

components when observing or moving a

removed MPU, CF card, or service card.

EMI prevention

Take effective measures to protect the power
system from the power grid system.

Separate the protection ground of the firewall from

the grounding device or lightning protection
grounding device as far as possible.

Keep the firewall far away from radio stations,

radar and high-frequency devices working in high
current.

Use electromagnetic shielding when necessary.

Lightning
protection

The grounding cable of the chassis is well
grounded.

The grounding terminal of the AC power

receptacle is well grounded.

A lightning protector for a network port is

installed. (Optional)

The AC power supply has been connected to a

power strip with lightning protection. (Optional)