Installing the mounting brackets, Chassis rails, and grounding cable (for the, S5830-106s) – H3C Technologies H3C S5830 Series Switches User Manual
Page 19: Figure 15
Figure 15 Attaching the front mounting brackets and the chassis rails to the chassis
Installing the mounting brackets, chassis rails, and grounding
cable (for the S5830-106S)
The S5830-106S switch provides one front mounting position (near the network ports) and one rear
mounting position (near the power modules), and two grounding points—one primary grounding point
(with a grounding sign), and one auxiliary grounding point. You use the primary grounding point in most
cases. If the primary grounding point fails or is not suitable for the installation site, use the auxiliary
grounding point.
Figure 16 Identifying the mounting and grounding positions
(1) Rear mounting position
(2) Primary grounding point
(3) Auxiliary grounding point
(4) Front mounting position
Attaching the mounting brackets and chassis rails to the switch chassis
1.
Align the mounting brackets with the screw holes in the rear mounting position (see
) or
front mounting position (see
2.
Use M4 screws (supplied with the switch) to fix the mounting brackets to the chassis.
3.
Align the chassis rails with the screw holes at the side panels (see
and
13