Installing the mounting brackets, Table 5 – H3C Technologies H3C S5830 Series Switches User Manual
Page 17
Table 5 Minimum and maximum distances required between front and rear rack posts
Switch model
Installation method
Minimum distance
between front and
rear rack posts
Maximum distance
between front and
rear rack posts
Mounting brackets and
short slide rails (supplied
with the switch)
401 mm (15.79 in)
654 mm (25.75 in)
S5830-52SC
Mounting brackets and
long slide rails (optional)
621 mm (24.45 in)
874 mm (34.41 in)
S5830-106S
Mounting brackets and
slide rails (supplied with
the switch)
489 mm (19.25 in)
993 mm (39.09 in)
Installing the mounting brackets, chassis rails, and grounding
cable (for the S5830-52SC)
The S5830-52SC switch provides one front mounting position (near the network ports) and one rear
mounting position (near the power modules), and two grounding points (one primary grounding point
with a grounding sign, and one auxiliary grounding point). You use the primary grounding point in most
cases. If the primary grounding point fails or is not suitable for the installation site, use the auxiliary
grounding point.
Figure 13 Identifying the mounting and grounding positions
(1) Rear mounting position
(2) Primary grounding point
(3) Auxiliary grounding point
(4) Front mounting position
Attaching the mounting brackets and chassis rails to the switch chassis
1.
Align the mounting brackets with the screw holes in the rear mounting position (see
) or
front mounting position (see
2.
Use M4 screws (supplied with the switch) to fix the mounting brackets to the chassis.
3.
If the mounting brackets are in the rear mounting position, align the chassis rails with the screw
holes at the front of the side panels (see
). If the mounting brackets are in the front
11