Preventive maintenance checklist – AEC HE Mass Flow Series Drying hoppers User Manual
Page 56

HE
• CHE • BCHE Mass Flow Series Drying Hoppers
Page 55
Preventive Maintenance Checklist
AEC/Whitlock HE
• CHE • BCHE Mass Flow Drying Hoppers
System model #
Serial #
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect all filters for
wear, replace/
clean if dirty or
worn.
Check air regulator
to make sure pres-
sure is 60-80 psi
(413.7 to 551.6 kPa
/4.1 to 5.5 bars). (If
applicable)
Every month
Jan Feb Mar Apr May
Jun
Jul
Aug
Sep Oct Nov
Dec
Lock out electrical
power and inspect
electrical wiring for
integrity.
Lock out electrical
power and check
heater elements for
continuity using an
ohmmeter.
Check dew point
and temperature
tracking with an
external dew point
monitor and
pyrometer.
Visually inspect the
shifting of the
airflow valve during
one cycle.
Every year
Next scheduled
inspection
Actual inspection
Date/By
Next scheduled
inspection
Actual inspection
Date/By
Inspect desiccant.
Replace if brown or
broken.
Every two years
Scheduled
replacement date
Actual replacement
Date/Work done by
Scheduled
replacement date
Actual replacement
Date/Work done by
Replace desiccant.
- Photocopy this page for your maintenance records -