3 shutting down the process – AEC HE Mass Flow Series Drying hoppers User Manual
Page 23
Page 22
HE
• CHE • BCHE Mass Flow Series Drying Hoppers
4-3 Shutting Down the Process
Caution!
Allow the drying hopper to cool before handling.
1. Turn off the conveying system supplying the drying hopper, dryer and drying hopper
controls. If desired, empty the hopper.
2. When processing is complete, close the hopper slide gate and shut down any in-line
companion equipment, such as an Aftercooler.
3. Turn the dryer and drying hopper off.
4. For maintenance or long-term shut down, open (de-energize) the electrical disconnect at
the dryer, drying hopper and the one in your power drop.
This manual is related to the following products: