Table of contents 1, General information, Shipping information – AEC HE Mass Flow Series Drying hoppers User Manual
Page 5: Installation, Startup, shutdown, and operation

Page 4
HE
• CHE • BCHE Mass Flow Series Drying Hoppers
Table of Contents
1
General
Information
.................................................
7
1-1 Introduction
1-2 Equipment
Function
1-3
The HE Heater Drying Hopper Package
1-4
The CHE Control and Heater Drying Hopper Package
1-5
The BCHE Blower Controls Heater Drying Hopper Package
2
Shipping
Information ............................................. 11
2-1 Unpacking
and
Inspection
2-2
In the Event of Shipping Damages
2-3
If the Shipment is Not Complete
2-4
If the Shipment is Not Correct
2-5 Returns
3
Installation
...............................................................
13
3-1 Work
Rules
3-2 Necessary
Documents
3-3
Installing Machine-Mount Drying Hoppers
3-4 Installing
Floor-Mount Drying Hoppers
3-5
Making Hose Connections
3-6
Making Electrical Connections
3-7
Checking for Proper Blower Rotation
4
Startup, Shutdown, and Operation ....................... 21
4-1 Pre-Startup
Checklist
4-2
Starting the Process
4-3
Shutting Down the Process