Scheduled reports tab, Creating a report – Wavetronix Command DataView (CMD-DV) - User Guide User Manual
Page 60

CHAPTER 6 • REPORTS PAGE
59
ing options are available:
˽
Status – Show only reports that succeeded or failed. (default: display all reports)
˽
Scheduled – Show only reports that have been created manually, or on an automatic
schedule. (default: display all reports)
˽
User – Show reports requested by all users, or just the current one. (default: display
only reports requested by current user)
˽
Report Type – Show only reports of the given type. (default: display all reports)
To delete existing reports, select one or more reports by checking the box in the left col-
umn and push Delete Reports. To see if currently processing reports have finished (or if
additional reports have been added to the system by other simultaneous users), push the
Refresh button to refresh the grid with the current status of all reports.
Scheduled Reports Tab
The Scheduled Reports tab presents a similar grid containing only those reports that were
created on an automated schedule.
Figure 6.3 – Scheduled Reports Tab
This view is functionally equivalent to selecting Scheduled: Yes from the filter menus on
the Reports tab. The advantage to using the Scheduled Reports tab is the grid will also
display the Last Run and Next Run times, indicating when the report will next be created
according to the current schedule. The schedule can also be edited directly by clicking on
the Edit link (see Creating a Scheduled Report below).
Creating a Report
To create a new report, either manually or one that will be created according to a fixed
schedule, push the New Report button. The Configure Report screen will be displayed (see
Figure 6.4).