Sample Applications

B-8

Verilink C100 and C150 T1/FT1 CSU/DSU

6/15/99

C150 T-1 CSU/DSU connecting two PBXs and converting D4 To ESF

The T-1 CSU/DSU can be used to connect two PBXs together over a T-
1 facility as shown in

Figure B-4

. Since some older PBXs don’t support

ESF framing, the CSU/DSU’s can also be used to convert D4 to ESF
framing as described in this example. ESF provides the user with
better diagnostics, reporting and maintenance from the CSU/DSU’s
and the T-1carrier provider. In this mode, the Synchronous channel is
not used.

Table B-4 illustrates the switch configuration. There is very little
change from the factory default selection (all switches Off) in this
application. The only switch setting changes are Switch pack 3
positions 2 and 3 from ESF (Off) to D4 (On) and B8ZS (Off) to AMI
(On) respectively at both the local and remote sites. This sets the DSX1
channel to D4 with AMI encoding at both ends and leaves the
Network Interfaces set to ESF (Switch pack 2 position 1 Off). Since the
DSX1 channel is using all the DS0’s in this application, Switch pack 5,
6, and 7 are all programmed Off.

Timing is left in the default setting of

Network provides timing

with

Switch pack 2 positions 7 and 8 Off since the units are connected to a
carrier-provided T-1 Network.

The Off position of the DIP switch is the rocker arm of the switch in its
lowest position (down) on the side of the switch closest to the front
panel.

Figure B-4

C150 T-1 CSU/DSUs connecting two PBXs over T-1 and converting D4 to ESF

C150 only

P

P

Local Site

ESF NI

D4 CI DSX1

................

TEL-LINK

T1 CSU/DSU

ESF NI

................

TEL-LINK

T1 CSU/DSU

D4 CI DSX1

Remote Site

NETWORK

C150

C150