beautypg.com

Seaward 350 PrimeTest User Manual

Page 84

background image

PrimeTest 350 Operating

Instructions

- 83 -


The sequence will now progress to the Earth Continuity
test as shown. This test will measure the resistance of
the protective earth path.

The START key icon is flashing, indicating that a key
press is required to initiate the test. The probe icon is
illuminated to indicate that the test probe is required for
this test. Connect the test probe to an exposed metal
part on the equipment under test and press the START
key to begin measurement.
Real time measurement values are displayed whilst the
test is in progress.