Seaward 350 PrimeTest User Manual
Page 83
PrimeTest 350 Operating
Instructions
- 82 -
If the red STOP key is pressed during a test then the
test is aborted and the abort menu appears as shown
below:
Restart Test will return to the beginning of the test that
was aborted.
Restart Appliance will return to the beginning of the test
sequence.
Abort Test will skip the test that was aborted and
proceed to the next test in the sequence.
Abort Appliance will abort the test sequence.
The first test in this sequence is a visual inspection.
The default Visual Test consists of a three-point
inspection of the appliance cord, power lead and fuse.
After performing the inspection, the appropriate
PASS/FAIL results are entered using the function keys
Pass (F3), Fail (F1) or N/A (F2). Function key Pass All
(F4) allows a PASS result to be entered for all points of
the inspection.
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)