15.7 Load
Measurement
Load current is measured during the 2 powered tests
only. The load in kVA is calculated from incoming
mains voltage and the load current.
Load Display Range
0 – 4.00kVA
Load
Resolution 0.01kVA
Load
Accuracy
±
10%
±5
digits
15.8 Earth Loop Resistance
Test Voltage
Mains supply 230V +10% / -15%
Test Current
Non-trip for 30mA RCD
Test
Duration Approx
10
seconds
Pass/Fail
Limit
User
Defined
Display
Ranges
0.0
–
199
Measuring Range
1.0 – 199
Resolution 0.1
, 0.0 – 19.9
1
, 20 – 199
Accuracy
±
10%
±2
digits
15.9 RCD Trip Time
Test Voltage
Mains supply 230V +10% / -15%
Test Current
30mA rms sinusoidal
Test
Duration 2000ms
max
Pass/Fail
Limit
None
Display
Range
0
–
2000ms
Measuring Range
20 – 2000ms
Resolution
1ms
Accuracy
±
10%
15.10 IEC Lead Test
This is a 3 part test is made up of:
Earth Continuity – specification as 10.1 above.
Insulation Resistance – specification as 10.2 above.
Wiring Check – checks for:
Live open
Neutral
open
L/N
Short
L/N Reversed
1.2Ω