Installation and configuration, Prepare for installation, Physical connection overview – RLE 10K V.2.5.a User Manual
Page 13: Nstallation, Onfiguration

rletech.com
SeaHawk 10K User Guide
13
C
H A P T E R
C
HAPTER
0
I
NSTALLATION
AND
C
ONFIGURATION
2.1.
Prepare for Installation
To install the SeaHawk 10K, you’ll need following supplies:
Included with the SeaHawk 10K
♦
15 foot (4.57m) leader cable
♦
End-of-line terminator (EOL)
Available from RLE, sold separately
♦
12-24 VAC/VDC, 50-60Hz isolated power supply
♦
SeaHawk Sensing Cable, up to 10,000 feet (3048m)
♦
J-Clips
Available from other vendors
♦
Electrostatic discharge (ESD) protection
2.2.
Physical Connection Overview
The SeaHawk 10K contains two circuit boards:
♦
The top circuit board houses operational controls and displays. SeaHawk 10K operational
information is found in Chapter 3.
♦
The lower circuit board houses the connectors for:
–
AC/DC power
–
Earth ground
–
Relay output
–
Leak detection cable
–
Communications