5

Unit layout

Operating range

Modular systems can be created
with the GPM-series gas wall
heaters.
Modular systems consist of one
or multiple fan-assisted air heaters
in order to heat small spaces like
workshops to larger spaces like
industrial halls, churches, sports
facilities, etc..
Therefore it is necessary to
determine the necessary heat
output by calculating the heat
requirement.

General requirements

With the installation of the units,
the local and country-specific
provisions and guidelines must be
observed in the respective valid
version as a basic rule.
Work such as:

gas and electrical installation

conversion of the gas type

commissioning

adjustments or maintenance

may only be carried out by
qualified technicians

In addition to a faultless electrical
and gas installation, it is also
ensured through this measure that
all necessary measurements and
test are conducted.

With improper installation and
operation, hazards may arise
from the equipment. Prior to
the planning and during the
installation of the unit, the
following points must absolutely
be observed.

The units must be installed and

operated in such a way that
personnel are not endangered
by exhaust and radiant heat and
no fires may occur

During installation of the units

it must be ensured that the
flow of warm air does not
have damaging effects on the
surroundings

Fire hazards must be eliminated

through the selection of
materials for the installation
and position surfaces. For this
purpose, see TRGI, Section
5.1.3.3

The wall or ceiling intended for

installation must also consist of
non-flammable materials. Its
load capacity must be checked;
reinforcements must be installed
when necessary

Brackets must be securely

anchored to the wall or ceiling
and the units must be attached
to the brackets at the points
provided for this purpose at the
factory

Appropriate maintenance

possibilities for heat exchangers,
burners, ventilators and flue gas
evacuation must be planned for

It must be possible to actuate

control elements for the units
and fuel supply from the
ground.

Maintenance and repair

possibilities must be ensured by
the operator

The units must be inspected by
an authorised service technician
at least once annually. For this
purpose, concluding a service
contract with a service company
is recommended

During planning and installation

of the exhaust gas routeing, the
structural possibilities as well as
the applicable local and country-
specific regulations must be
consistently adhered to.

In dusty environments, as well

as in places with ammoniacal
atmospheres, service and
maintenance measures must be
carried out in accordance with
the respective conditions. The
combustion air must be fed from
outside as a basic rule

Selection of the installation
location

With determination of the
installation location, the
requirements must
be coordinated in regard to:

Fire protection and operational

hazard

Function:

space heating, underpressure
and/or overpressure in the
installation space, etc.

operational concerns, heat

requirement, nominal air flow
rate, circulating air requirement,
humidity, room temperature, air
distribution, spatial requirements

installation, repair and

maintenance possibilities. The
units must be installed in such a
way that they are always easily
accessible for maintenance and
repair work.

The equipment may not be
set up or installed in areas
with explosive or corrosive
atmospheres!

ATTENTION