Receiving and unpacking – Nortec MH Series User Manual
Page 5
Introduction | 2
Receiving and Unpacking
1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.
Nortec assumes no responsibility for any material shortages beyond this period.
3 Inspect shipment for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or
loss claims are to be made directly to the shipping company.
Before Installation
1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2 Ensure sufficient clearances will be available for P-Trap on drain pan overflow and for proper
slope of drain line from hydraulic unit.
3 Ensure sufficient clearances will be available as described in Location on page 13.
4 Ensure duct access will be available from downstream of duct manifold to install, maintain,
and replace media boxes.
5 Report any discrepancy immediately to the site engineer.
Figure 1: Specification Label Location
Note:
Each MH is shipped in multiple packages containing; 1) Control Box, 2) Hydraulic Unit,
3) Drain pan and duct manifold sheet metal, 4) Media Boxes, 5) Mist Eliminator
(if ordered).