43 | Start Up
MHTC/B Pre-Start Up Checklist
Unit Serial #: _________________ Tag: _______________
Model: MHTC Reflow MHTC Flow MHB
Customer/Job:
Address:
Water Quality:
Potable RO DI
Air Conditions
Air Filters (MERV 8, 11 or better)
Uniform air flow
Air Velocity
Duct static pressure
Air temperature before duct unit
Duct Unit Mounting:
20 in.+ (50 cm)+ from heaters
Access door for media removal
Space for media removal
Drain pan edges Level
Side panels fastened to walls
Sealed between duct wall and unit
Water tight section min. 3 ft. past duct module Corrosion resistant if DI water used
Drain downstream from duct module
Mist Eliminator if > 750 fpm (3.8 m/s)
(yes/no)
MHTC Reflow Hydraulic Unit Mounting:
Level Front/Top Clearance
Reservoir below drain pan
Water / Drain Line:
Water line size (min. 1/2 in.)
Water pressure: 30-80 psig
Drain Ø (min. 1 1/4 in. (32 mm) ID
Drain lines sloped
MHTC Reflow Plumbing
P Trap 6 in. (15 cm) or duct static pressure +2 in. on overflow Hydraulic unit drain
Spray bar lines connected to correct staging valves No low points
Pressure equalization hose connected No dips/sags in press. equalization hose
All hose connections clamped
MHTC Flow / MHB Plumbing
P Trap 6 in. (21 cm) or duct static pressure +8 in. on Pan Drain
Overflow capped
Spray bar lines connected to correct staging valves No low points
All hose connections clamped
Wiring:
MHTC Flow and Reflow wiring between control box and hydraulic unit to correct terminals
Wiring connections and connectors secured
Controls:
Control Location
Control to Terminal 4
Air proving switch
On/Off controls to Terminal 2
Power:
Voltage, amp, fuse per Spec Label:
Disconnect switch located close to MH
Inspected by:
Date of inspection: ______/_______/______
Company: