Installing the Gear Train Upgrade Kit

Page 8

MDE-4291 Gasboy Gear Train Upgrade Kit M04477K001 • March 2004

3

Using the two 18 inch 1x4s as spacers, lift the register platform and slide the spacers in
between the platform and the upper frame rails. (See

Figure 4

.)

Figure 4: Lifting the Register Platform

4

Remove the four bolts that mount the gear train assembly to the register platform and retain
the bolts. (See

Figure 5

.)

Figure 5: Gear Train Bolt Removal

Insert Spacer Here (on each side)

Remove Gear Train Assy Bolts (on each side)