beautypg.com

Testing/checking operation – Gasboy Kit M04477K001 User Manual

Page 11

background image

MDE-4291 Gasboy Gear Train Upgrade Kit M04477K001 • March 2004

Page 11

Installing the Gear Train Upgrade Kit

Figure 9: Meter Interface Link

3

Reversing the removal process, position the gear train back in between the meter mounting
brackets and the meters as before.

4

Install the shorter display drive shaft (M04433B001) (see

Figure 10

) between the gear train

and the register.

Figure 10: Display Drive Shaft

5

Remove the two 1X4s and set the register platform back down on the frame rails while trying
to align the meter interface links and the four meter-mounting-brackets to the meters.

6

Insert and loosely thread the four bolts that mount the gear train assembly to the register
platform. (Do not tighten until all bolts are threaded into their respective locations.)

7

Insert and thread the eight bolts securing the meters and the eight bolts that mount the register
platform to the frame, so that they are still loose - not tightened. (This is required so as to
enable the alignment of all the bolts into their respective holes.)

8

Once all the bolts are inserted and threaded in loosely, tighten all twenty bolts.

Testing/Checking Operation

1

Restore power to the unit.

2

Slowly dispense fuel and observe that the digits turn smoothly and that no binding is
occurring.

Guide Pins