Installing the Gear Train Upgrade Kit

Preparation

1

Request permission from the manager/owner to remove power from the unit and then remove
power using normal procedures. Observe the lockout/tagout safety procedures.

2

Using the proper key for the unit, unlock and remove the lower and upper doors from both
sides of the unit. Place doors in a safe place to prevent damage or scratches. (See

Figure 1

)

Figure 1: GasBoy Cover Removal

3

Make sure you have the proper kit for the model dispenser to be retrofitted.

Shows Doors
Removed Both Sides

Work Area

Junction Box Denotes
Side 1 or Front