beautypg.com

Gasboy Q User Manual

Page 9

background image

MDE-4369 Aviation Tubing Retrofit Kit for Gasboy® Q Models Kits M05023K001 & K05023K002 • October 2004

Page 9

Installing the M05023K002 Kit for Remote Dispensers

hold O-rings in place during assembly.)

10

Open shear valve.

11

Return power to pump and run fuel through the pump and inspect for leaks.

12

Purge all air from the unit (usually 10 gallons is recommended).

13

Remove catch basin, tools and absorbent materials. (Dispose of absorbent materials and fuels
in a safe manner. Do not dispose of them in station trash receptacles or in the pump pit box.)

14

Re-install the front and back doors to the pump.