Gasboy Q User Manual
Page 7

MDE-4369 Aviation Tubing Retrofit Kit for Gasboy® Q Models Kits M05023K001 & K05023K002 • October 2004
Page 7
Installing the M05023K001 Kit for Suction Pumps
9
Install new steel tubing and new O-Rings, (Q10068 14 at meter flange and 049002 at the
pumping unit flange) and attach steel tubing using existing bolts. (The use of silicone grease
helps to hold O-rings in place during assembly.)
10
Return power to pump and run fuel through the pump and inspect for leaks.
11
Purge all air from unit (usually 10 gallons is recommended).
12
Remove catch basin, tools and absorbent materials. (Dispose of absorbent materials and fuels
in a safe manner. Do not dispose of them in station trash receptacles or in the pump pit box.)
13
Re-install the front and back doors to the pump.
- 216S (18 pages)
- Atlas Fuel Systems Site Prep Manual (42 pages)
- Atlas Technician Programming Quick Ref (2 pages)
- ATC M05819K00X Kits (28 pages)
- Atlas Fuel Systems Owner Manual (80 pages)
- Gilbarco Global Pumping Unit Operation Manual (42 pages)
- 26 (7 pages)
- Atlas Valve Replacement Kits (10 pages)
- Atlas Fuel Systems Installation Manual (100 pages)
- 9120K (8 pages)
- 9820K (6 pages)
- Atlas Single Std. Inlet Centering Kit (8 pages)
- 8800 Atlas (1 page)
- 9120K Series Service Manual (40 pages)
- 9800A Atlas (6 pages)
- 9800 Atlas (14 pages)
- 9800 Atlas (20 pages)
- M08400 (6 pages)
- 9100 Series (8 pages)
- 9820K Series Installation (62 pages)
- 9853K (8 pages)
- 9216KTW (36 pages)
- Recommended Spare Atlas (14 pages)
- DEF Atlas (28 pages)
- 9820K Series (12 pages)
- 9800Q (1 page)
- Q Series (3 pages)
- 8753E (2 pages)
- 9152AXTW2 (1 page)
- 8800E (2 pages)
- 8800E (1 page)
- 9820Q Series (1 page)
- Atlas Start-up (230 pages)
- 2600A (2 pages)
- 9800Q Front Load Vapor (2 pages)
- 215A (1 page)
- 9800A (4 pages)
- 9820A (1 page)
- 2600A (3 pages)
- 2600A (12 pages)
- 216A (31 pages)
- 215A (2 pages)
- 9800Q Vapor (2 pages)
- Lamp Kit (2 pages)
- 9120Q Pulser (1 page)