Fronius Energy Package User Manual
Page 90
88
- off: For entering an effective power limit as of which output I/O 1 is to be deacti-
vated.
(4)
Duration
- Field for activating the minimum running time per switch-on operation
- Field for specifying the minimum amount of time that output I/O 1 should remain
activated for per switch-on operation.
- Field for activating the maximum running time per day
- Field for specifying the maximum total amount of time that output I/O 1 should be
activated for per day (allowing for several switch-on operations).
(5)
Desired duration
- Field for activating a desired running time