beautypg.com

Artesyn ATCA-F120 Installation and Use (August 2014) User Manual

Page 34

background image

Hardware Preparation and Installation

ATCA-F120 Installation and Use (6806800D06J)

34

5. Fully insert the blade and lock it to the shelf by squeezing the lever and the latch

together and turning the handles towards the face plate.

If your shelf is powered, as soon as the blade is connected to the backplane power
pins, the blue LED is illuminated.
When the blade is completely installed, the blue LED starts to blink. This indicates
that the blade announces its presence to the shelf management controller.

6. Wait until the blue LED is switched off, then tighten the face plate screws which

secure the blade to the shelf.

If an RTM is connected to the front blade, make sure that the handles of both the RTM and the
front blade are closed in order to power up the blade`s payload.