Commissioning

Operating Manual PNOZ m B0
1002660­EN­03

18

6.2.1

Load project from chip card

Procedure:

}

Insert the chip card containing the current project into the card slot on the base unit.

}

Switch on the supply voltage. The LC display shows the project name, CRC sum and
the date the project was created. Please check this information.

}

Load the project by pressing the rotary knob. For the project to be downloaded, the
rotary knob must be held down for between 3 and 8 seconds. Once the project has
been successfully downloaded, the status of the inputs and outputs will be shown on
the display.

6.2.2

Load project via USB port

Procedure:

}

Insert a chip card into the card slot on the base unit.

}

Connect the computer containing the PNOZmulti Configurator to the base unit via the
USB port.

}

Switch on the supply voltage.

}

Download the project (see PNOZmulti Configurator's online help).

}

Once the project has been successfully downloaded, the status of the inputs and out­
puts and the supply voltage will be shown on the display. The "RUN" LED will be lit.