Preparing for operation, Connection, 6commissioning – Pilz PNOZ ml1p safe link 24VDC User Manual
Page 24: 2 preparing for operation, 2 connection
6.2
Preparing for operation
6
Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
6-2
6.2
Preparing for operation
6200
Preparing for operation
6-
6.2.1
Download modified project to the PNOZmulti safety system
Download modified project to the PNOZmulti safety system
6-
Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA
As soon as an additional expansion module has been connected to the
system, the project must be amended using the PNOZmulti Configura-
tor. Proceed as described in the operating instructions for the base unit.
6.2.2
Connection
Connection
6-
Betriebsbereitschaft herstellen Anschluss
`
Supply voltage
`
Connection of two PNOZmulti base units via PNOZ ml1p
NOTICE
For the commissioning and after every program change, you
must check whether the safety devices are functioning correctly.
Supply voltage
AC
DC
24V
+ 24 V DC
0 V
24V
0V
0V
CA+
CA-
CB+
CB-
Shield
CA+
CA-
CB+
CB-
Shield
PNOZ ml1p
PNOZ ml1p