beautypg.com

Installation, General installation guidelines, 5installation – Pilz PNOZ ml1p safe link 24VDC User Manual

Page 19: 1 general installation guidelines

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

5-1

5.1

General installation guidelines

5

Installation

5

5000

Installation

Installation

5-

5.1

General installation guidelines

5100

General installation guidelines

5-

Montage_multi_allgemein

`

The safety system should be installed in a control cabinet with a pro-

tection type of at least IP54. Fit the safety system to a horizontal DIN

rail. The venting slots must face upward and downward. Other mount-

ing positions could destroy the safety system.

`

Use the notches on the back of the unit to attach it to a DIN rail. Con-

nect the safety system to the DIN rail in an upright position so that the

earthing springs on the safety system are pressed on to the DIN rail.

`

The ambient temperature of the PNOZmulti units in the control cabi-

net must not exceed the figure stated in the technical details, other-

wise air conditioning will be required.

`

To comply with EMC requirements, the DIN rail must have a low im-

pedance connection to the control cabinet housing.

Montage_multi_Bild_BA

Montage_EMV ESD

CAUTION!

Damage due to electrostatic discharge!

Electrostatic discharge can damage components. Ensure

against discharge before touching the product, e.g. by touching

an earthed, conductive surface or by wearing an earthed arm-

band.

This manual is related to the following products: