Commissioning, General wiring guidelines, 6commissioning – Pilz PNOZ mml1p User Manual
Page 21: 1 general wiring guidelines
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
6-1
6.1
General wiring guidelines
6
Commissioning
6
6000
Commissioning
Commissioning
6-
6.1
General wiring guidelines
6100
General wiring guidelines
6-
Verdrahtung_multi_Modul
The wiring is defined in the circuit diagram of the PNOZmulti Configura-
tor.
Note:
Information given in the "Technical details" must be followed.
Verdrahtung_Netzteil_sichere_Trennung
The power supply must meet the regulations for extra low voltages
with safe separation.
Verdrahtung_multi_Verbindungsmodul_mml1
2 connection terminals are available for each of the supply connec-
tions 24 V and 0 V. This means that the supply voltage can be looped
through several connections. The current at each terminal may not
exceed 3 A.
The max. cable length between two link modules on a connection
with one link module
– PNOZ ml1p – PNOZ ml1p from V2.0, PNOZ mml1p: 1000 m Connect the inputs and outputs from two link modules with 4-core shielded cable. The cables must be twisted in pairs (see “Preparing for operation”). Note the crossover cabling, e.g. CA+ with CB+. The cables must be classified into a minimum of Category 5 in ac- cordance with ISO/IEC 11801. Verdrahtung_multi_Achtung_Kabel_spannungsl_ziehen_Modul CAUTION! Only connect and disconnect the expansion module when the supply voltage is switched off.